
Our 7” system has been working in several basins for multiple customers since its deployment earlier in 2019. To date, the system has pumped over 500 stages with no failures or significant erosion enabling the system to follow the frac spread between well sites. The 7” system can support flowrates well above 100 bpm enabling our customers to meet the challenge of their most difficult wells.
ความคิดเห็น